人民黄河Issue(3):67-69,3.DOI:10.3969/j.issn.1000-1379.2013.03.022
山西省中部引黄取水条件及引沙状况分析
Analysis on Taking Water and Diverting Sediment Conditions of the Yellow River Diversion Project in Central Shanxi Province
摘要
Abstract
Diversting water must contain sediment in the Yellow River diversion project in central Shanxi Province. In order to fully understand the impact,this paper analyzed the inflow water and sediment conditions and water flow regime and sediment concentration distribution near the water in-take of Tianqiao Reservoir through measured data. The result shows that the sediment of the Yellow River will impact the diversion project in two as-pects. First,the river deposits near the water intake and uplifts local beach,such that water taking is more difficult. Second,water intake tunnel and long-distance water conveyance tunnel are deposited. It should take high attention to designing and operating the Yellow River Diversion Project in central Shanxi Province. In order to maintain the diversion project normal operation,we should take positive measures for sediment control.关键词
引黄工程/泥沙/淤积/天桥库区/山西省Key words
Yellow River diversion project/sediment/deposition/Tianqiao Reservoir/Shanxi Province分类
建筑与水利引用本文复制引用
林秀芝,申冠卿,郭彦..山西省中部引黄取水条件及引沙状况分析[J].人民黄河,2014,(3):67-69,3.基金项目
“十二五”国家科技支撑计划项目(2012BAB02B03)。 ()