积石峡水电站面板堆石坝湿化变形控制研究

张伟 雷艳 蔡新合 崔文娟

人民黄河Issue(3):126-128,3.
人民黄河Issue(3):126-128,3.DOI:10.3969/j.issn.1000-1379.2014.03.041

积石峡水电站面板堆石坝湿化变形控制研究

Research on Wetting Deformation Control of CFRD for Jishixia Hydropower Station

张伟 1雷艳 2蔡新合 2崔文娟3

作者信息

  • 1. 黄河上游水电开发有限责任公司,青海西宁810008
  • 2. 中国水电顾问集团西北勘测设计研究院,陕西西安710065
  • 3. 河南黄河勘测设计研究院,河南郑州450003
  • 折叠

摘要

Abstract

In the concrete faced rock-fill dam of Jishixia Hydraulic Power Station,the major material zone was filled by excavation of stones in dam area. In order to control rock-fill material’s wetting deformation,the dam bottom took immersion measures after the completion of dam filling. The monitoring results show that the dam immersion can release the wetting deformation in advance and is especially suitable for the dam body filled with the rock of smaller softening coefficient such as soft rock and weathered rock,that dam immersion can create a prerequisite condition of completion in advance and crack control from accelerating the deformation and shortening settlement time of concrete faced rock-fill dam during construction, and that the dam water level difference between inside and outside should not exceed 1 m during dam drainage stage.

关键词

面板堆石坝/开挖料/湿化变形/坝体浸水/积石峡水电站

Key words

concrete faced rockfill dam/excavated rock/wetting deformation/dam immersion/Jishixia Hydropower Station