| 注册
首页|期刊导航|山东煤炭科技|铁新煤矿 E902工作面过断层方案研究

铁新煤矿 E902工作面过断层方案研究

何清 王耀光 王世昌

山东煤炭科技Issue(2):23-24,2.
山东煤炭科技Issue(2):23-24,2.DOI:10.3969/j.issn.1005-2801.2014.02.11

铁新煤矿 E902工作面过断层方案研究

Study on Tiexin Coal Mine E902 Working Face Crossing Fault Scheme

何清 1王耀光 1王世昌1

作者信息

  • 1. 山西保利铁新煤业有限公司,山西 灵石 031300
  • 折叠

摘要

Abstract

The nineth coal seam of Tiexin coal mine is thin coal seam with large fault,three meters fault -line is in front of the working face E902,seriously affecting the normal mining in fully mechanized working face,so set up two schemes for the face and roadway crossing fault and avoiding fault.In order to determine the reasonable plan, respectively from the waste rock,engineering quantity ,cost,resource recovery and safety and other aspects of study, through the study found that when using the work face crossing fault is reasonable and feasible both in economy, technology,security.

关键词

过断层/综采工作面/补掘巷道/资源回收率

Key words

crossing fault/fully mechanized working face/reinforcing roadway/resource recovery

分类

矿业与冶金

引用本文复制引用

何清,王耀光,王世昌..铁新煤矿 E902工作面过断层方案研究[J].山东煤炭科技,2014,(2):23-24,2.

山东煤炭科技

1005-2801

访问量0
|
下载量0
段落导航相关论文