水力发电2014,Vol.40Issue(5):73-76,87,5.
高坝大库水电站地震应急预案及亟待解决的问题
Earthquake Contingency Plan of Hydropower Station with High Dam and Large Reservoir and the Problems to be Solved
郑琳1
作者信息
- 1. 中国水电工程顾问集团有限公司,北京100120
- 折叠
摘要
关键词
地震/水电站/高坝大库/应急预案Key words
earthquake/hydropower station/high dam and large reservoir/contingency plan分类
资源环境引用本文复制引用
郑琳..高坝大库水电站地震应急预案及亟待解决的问题[J].水力发电,2014,40(5):73-76,87,5.