| 注册
首页|期刊导航|铁道标准设计|混合梁斜拉桥钢混结合段设计

混合梁斜拉桥钢混结合段设计

蔡建业

铁道标准设计Issue(1):68-71,4.
铁道标准设计Issue(1):68-71,4.DOI:10.13238/j.issn.1004-2954.2014.01.017

混合梁斜拉桥钢混结合段设计

Design for Steel-Concrete Joint Segment of Cable-stayed Bridge with Hybrid Girder

蔡建业1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 折叠

摘要

Abstract

The design of steel-concrete joint segment is one of the key technologies of a cable-stayed bridge with hybrid girder, while the design of location, type and detail structure of steel-concrete joint segment will directly affect the safety and durability of the bridge. This paper introduces the design of the steel-concrete joint segment of the Fuming Road cable-stayed bridge in Ningbo City, including the determination of location, the selection of structure types, the detail structure, the structure calculation and analysis of steel-concrete joint segment. The results show that this bridge structure is under rational stress state, the force transmission is smooth and the rigidity transition is steady.

关键词

斜拉桥/桥塔/钢混结合段/合理位置/结构设计

Key words

cable-stayed bridge/pylon/steel-concrete joint segment/rational position/structure design

分类

交通工程

引用本文复制引用

蔡建业..混合梁斜拉桥钢混结合段设计[J].铁道标准设计,2014,(1):68-71,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文