甘肃敦煌城区 DR3地热探采结合孔成井工艺
Well Completion Technology for DR3 Geothermal Mining-exploiting Combination Well of Dunhuang
张耀辉1
作者信息
- 1. 甘肃省地矿局水文地质工程地质勘察院,甘肃张掖734000
- 折叠
摘要
Abstract
The paper introduces the well completion process for DR3 geothermal mining-exploiting combination well in Dun-huang of Gansu Province.The water swelling rubber was successfully introduced for water stopping with simple and reliable effects.The techniques of the permanent water stopping by mud pump cementing and the effectively control on borehole in-clination have certain reference values to the similar geothermal well construction.关键词
探采结合孔/成井工艺/下管/止水/固井/遇水膨胀橡胶Key words
combination of mining-exploiting borehole/well completion process/tube lowering/water stopping/cemen-ting/water swelling rubber分类
天文与地球科学引用本文复制引用
张耀辉..甘肃敦煌城区 DR3地热探采结合孔成井工艺[J].探矿工程-岩土钻掘工程,2014,(1):33-36,4.