| 注册
首页|期刊导航|西北水电|工程建设施工现场临时用电设计及管理中应注意的事项

工程建设施工现场临时用电设计及管理中应注意的事项

张轲

西北水电Issue(5):60-63,4.
西北水电Issue(5):60-63,4.

工程建设施工现场临时用电设计及管理中应注意的事项

Tips on Design and Management of Temporary Power Supply at Construction Site

张轲1

作者信息

  • 1. 中国水利水电建设工程咨询西北公司,西安 710075
  • 折叠

摘要

Abstract

Issues on power supply for construction are pointed out as well as tips on design and management of temporary power supply at construction site are described in accordance with description of calculation of construction power load, basic system, analysis and com-parison of power supply and distribution lines, leakage protection, breaker selection, operation and maintenance of distribution lines, cur-rent calibration of protection element, safety voltage, line selection, phase and sequence balance, power factor, and reactive load com-pensation, etc.

关键词

施工现场/临时用电/管理

Key words

construction site/temporary power supply/management

分类

建筑与水利

引用本文复制引用

张轲..工程建设施工现场临时用电设计及管理中应注意的事项[J].西北水电,2013,(5):60-63,4.

西北水电

1006-2610

访问量3
|
下载量0
段落导航相关论文