In Luogu Hydropower Project, three surface outlets are arranged centrally and two bottom outlets on both sides.The surface outlet is with the energy dissipation structure consisting of X-type flaring pier, WES curve, step weir surface and stilling basin.The bot-tom outlet is with the energy dissipation structure consisting of pressure chute within dam, ogee and stilling basin.Both surface and bot-tom outlets share the same stilling basin.Verified by model test, the layout of the energy dissipation structures of Luogu Hydropower Pro-ject well accommodate both the geological and topographical conditions at the dam site, satisfy requirements of flood discharge and energy dissipation, and achieve excellent energy dissipation.关键词
洛古水电站/泄洪消能/X型宽尾墩/泄水建筑物Key words
Luogu Hydropower Project/energy dissipation of flood discharge/X-type flaring pier/outlet structure分类