西北水电Issue(1):62-65,4.
某小型水电站压力钢管过河方案优化设计
Optimizing Design of Scheme for Penstock Crossing River
代娇娇 1漆文邦 1刘卓娅 1倪婷1
作者信息
- 1. 四川大学水利水电学院,成都 610065
- 折叠
摘要
Abstract
Concerning the design of the scheme for a penstock crossing the river in one small hydropower station, the river-crossing scheme is to be selected from the river crossing with penstock bridge or the river crossing with buried penstock in combination with the ac-tual topographical and geological conditions.In the paper, these two schemes are compared in terms of technology and cost.The scheme of river crossing with the buried penstock is finalized.Furthermore, the technical difficulties of the selected river crossing scheme are ana-lyzed.This engineering experience proves that the scheme of river crossing with the buried penstock is better when the river valley section is gentle and the riverbed is wider.关键词
小型水电站/压力钢管/过河方案/埋管过河Key words
small-scaled hydropower station/steel penstock/river-crossing scheme/river crossing with buried penstock分类
建筑与水利引用本文复制引用
代娇娇,漆文邦,刘卓娅,倪婷..某小型水电站压力钢管过河方案优化设计[J].西北水电,2014,(1):62-65,4.