AP1000 nuclear power plant is a 3rd generation advanced passive 1000 MWe pressurized water reactor plant with two loops of reactor coolant systems .Compared with the conventional 2nd generation pressurized water reactor technology ,the steam generator ( SG) of AP1000 has many improved changes concerning SG property features and arrangement requirements for facilities within the nuclear island . Based on these improved changes and relevant installation practices ,the installation technology of AP 1000 SG has been introduced and analyzed including installation preparation ,transportation ,lifting,and instal-lation construction ,etc., with a view to provide a technical reference to the installation of main equip-ments in steam supply system of nuclear power plant .

关键词

压水反应堆/蒸汽发生器/安装

Key words

pressurized water reactor/steam generator/installation

分类

机械制造

引用本文复制引用

郑东宏,王志强,张明,门昌华,胡德全..AP1000蒸汽发生器安装技术[J].压力容器,2013,(12):64-70,7.

压力容器

OACSTPCD

1001-4837

访问量0
|
下载量0
段落导航相关论文