| 注册
首页|期刊导航|云南水力发电|三江口水电站扩建工程“越河取水”设计

三江口水电站扩建工程“越河取水”设计

林志华 姜志伟 杨小龙 高春涛

云南水力发电Issue(5):29-32,4.
云南水力发电Issue(5):29-32,4.DOI:10.3969/j.issn.1006-3951.2013.05-009

三江口水电站扩建工程“越河取水”设计

The Design of the Water-Intake Structure across the River of the Extension Project of the Sanjiangkou Hydropower Plant

林志华 1姜志伟 2杨小龙 1高春涛1

作者信息

  • 1. 中国水电顾问集团昆明勘测设计研究院,云南 昆明 650051
  • 2. 黄河勘测设计研究院,山东 济南 250013
  • 折叠

摘要

Abstract

The paper introduces the design of the water intake structure across the river ,including the shaft connection ,the pipe embedding across the river and the joining to the tunnel .The first generating unit of the extension project of the Sanjiangkou hydropower plant was put into commercial operation and connect-ed to the power grid on December 6th ,2006 .It stood the test of floods in 2007 and has operated for nearly 8 years to date .The whole water intake structure has been under proper operation .

关键词

扩建工程/取水布置/竖井/过河埋管/隧洞设计

Key words

extension project/water intake arrangement/shaft/pipe embedding across the river/design of tunnel

分类

建筑与水利

引用本文复制引用

林志华,姜志伟,杨小龙,高春涛..三江口水电站扩建工程“越河取水”设计[J].云南水力发电,2013,(5):29-32,4.

云南水力发电

1006-3951

访问量0
|
下载量0