盾构法隧道施工工后横向地表总沉降研究

杨泽飞 魏纲 林磊磊 张世民

岩土力学Issue(z2):338-343,6.
岩土力学Issue(z2):338-343,6.

盾构法隧道施工工后横向地表总沉降研究

Research on calculation of post-construction transverse surface settlement caused by shield tunneling

杨泽飞 1魏纲 1林磊磊 1张世民1

作者信息

  • 1. 浙江大学城市学院 土木工程系,杭州 310015
  • 折叠

摘要

Abstract

Due to the excess pore water pressure dissipation, the post-construction surface settlement will be continued caused by shield tunneling. Based on past research, a calculation method of initial excess pore water pressure around the tunnel is put forward. By using layerwise summation method, the surface consolidation settlement can be got within disturbed region of excess pore water pressure dissipation. Combining with the surface settlement in tunnel construction phase, total transverse post-construction surface settlement is obtained. The total surface settlement after soil consolidation is proposed;and surface settlement rate changes over time are also studied. As is shown in analytical calculation, the calculated results of the transverse surface settlement curves are in good agreement with the field data; and they are also in accordance with the normal distribution law. The development of total surface settlement rate is in good agreement with the field data.

关键词

盾构/地表沉降/超孔隙水压力/分层总和法

Key words

shield/surface settlement/excess pore water pressure/layerwise summation method

分类

交通工程

引用本文复制引用

杨泽飞,魏纲,林磊磊,张世民..盾构法隧道施工工后横向地表总沉降研究[J].岩土力学,2013,(z2):338-343,6.

基金项目

国家自然科学基金资助(No.51078332);浙江省科技厅项目资助(No.2013C31041)。 ()

岩土力学

OA北大核心CSCDCSTPCD

1000-7598

访问量0
|
下载量0
段落导航相关论文