首页|期刊导航|中国工程科学|三峡升船机齿条及螺母柱间隙灌浆工艺试验

三峡升船机齿条及螺母柱间隙灌浆工艺试验

詹剑霞 李纪虎

中国工程科学Issue(9):45-49,5.
中国工程科学Issue(9):45-49,5.

三峡升船机齿条及螺母柱间隙灌浆工艺试验

Clearance grouting process test of Three Gorges Project ship lift rack and nut column

詹剑霞 1李纪虎1

作者信息

  • 1. 中国葛洲坝集团股份有限公司三峡分公司,湖北宜昌 443002
  • 折叠

摘要

Abstract

In order to choose the suitable grouting material and grouting process,and simulate the actual situation of clearance grouting of rack and nut column in ship lift,grouting process test and prototype grouting experiment were carried out respectively. Comparing three kinds of domestic grouting material and the German PAGEL grouting material in grouting process test,the experimental results showed that the physical and mechani-cal property indexes of German PAGEL grouting material were superior to the domestic grouting material. In pro-totype grouting test,selection of the grouting equipment type,mixing time,templates seal,method of grouting parameters control of grouting flow were researched,and some applicable grouting material and grouting pro-cess were selected which were suitable for the rack and nut column joint in Three Gorges Project ship lift. The above test effects were obvious,and solved the construction problems of great difficulty in grouting seal and easy blockage of pipeline,etc.

关键词

齿条/螺母柱/灌浆/升船机/三峡工程

Key words

rack/nut column/grouting/ship lift/Three Gorges Project

分类

交通工程

引用本文复制引用

詹剑霞,李纪虎..三峡升船机齿条及螺母柱间隙灌浆工艺试验[J].中国工程科学,2013,(9):45-49,5.

中国工程科学

OA北大核心CSTPCD

1009-1742

访问量0
|
下载量0
段落导航相关论文