三峡升船机平衡重系统安装技术

蔡春华 罗彬

中国工程科学Issue(9):70-76,7.
中国工程科学Issue(9):70-76,7.

三峡升船机平衡重系统安装技术

Installation technology of counterweight system of Three Gorges Project ship lift

蔡春华 1罗彬1

作者信息

  • 1. 葛洲坝集团机电建设有限公司,成都 610091
  • 折叠

摘要

Abstract

The installation technology of counterweight system of Three Gorges Project ship lift has been studied in this paper based on the construction requirements of counterweight system and construction environment. The overall installation procedure of counterweight system has been put forward which are suitable for Three Gorges Project. Then the construction processes and construction methods of balance chain guide installation, balancing pulley installation,main hoist rope installation and counterweight installation have been described in detail. At the same time,the installation technology system of counterweight system is set up. This construction technology effectively solves many problems faced in the installation process of counterweight system of Three Gorges Project ship lift,such as large scale project,large component size,high accuracy requirements,high installation elevation,difficult construction,construction with wide distribution,complex construction conditions, etc. Meanwhile,the technology provides a good reference for similar projects at home and abroad.

关键词

三峡升船机/平衡重系统/安装程序/安装技术

Key words

Three Gorges Project ship lift/counterweight system/installation procedure/installation technology

分类

交通工程