三峡升船机塔柱混凝土施工测量技术

罗琛 晏春波

中国工程科学Issue(9):97-101,5.
中国工程科学Issue(9):97-101,5.

三峡升船机塔柱混凝土施工测量技术

Construction survey technology on concrete construction of Three Gorges Project ship lift tower

罗琛 1晏春波1

作者信息

  • 1. 中国葛洲坝集团股份有限公司测绘工程院,湖北宜昌 443002
  • 折叠

摘要

Abstract

Three Gorges Project vertical ship lift is high-walled tower structure. According to the preci-sion requirements of construction for concrete body and built-in embedded parts,the plane,elevation datum transmission and positioning measurement methods for embedded parts in construction survey of concrete and built-in embedded parts of Three Gorges Project ship lift tower were studied. The construction survey technolo-gies,including zenith telescope planar cast point,electromagnetic distance measuring and cylindrical nut type positioning device with a sighting mark in center are applied to size-control measurement for concrete structure and positioning measurement for built-in embedded parts respectively. Through the statistical analysis on the mea-sured data,the construction survey technology solutions for concrete construction of Three Gorges Project ship lift tower are proved to be reliable and feasible.

关键词

施工测量/天顶仪投点/电磁波测距/套管空间定位测量/三峡升船机

Key words

construction survey/zenith telescope cast point/electromagnetic distance measuring/spa-tial positioning measurement for casing/Three Gorges Project ship lift

分类

交通工程