2013版清单计价规范下招标控制价中其他项目费编制研究

郑晓虎

中国资源综合利用Issue(8):54-57,4.
中国资源综合利用Issue(8):54-57,4.

2013版清单计价规范下招标控制价中其他项目费编制研究

Study on the Compilation of the Other Items Cost in the Tender Sum Limit under the Code of Bills of Quantities and Valuation Issued in 2013

郑晓虎1

作者信息

  • 1. 北京矿冶研究总院,北京 100160
  • 折叠

摘要

Abstract

How to accurately draw up other items cost under the code of bills of quantities and valuation issued in 2013 to reasonable determine tender sum limit is one important issue of construction pricing. In the framework of the code of bills of quantities and valuation issued in 2013, this paper made other items cost in the tender sum limit as the research object, systematically summarized the scope and calculation method of provisional sum, prime cost sum, dayworks and main contractor's attendance, and then comprehensively summarized and analyzed the main point of compilation in other items cost. At last, this paper described the scope and calculation method of other items cost in detail through combining with one case, so that this paper could give guidance for tenderee to draw up other items cost under the code of bills of quantities and valuation issued in 2013.

关键词

2013版清单计价/招标控制价/其他项目费/编制

Key words

valuation with Bill quantity/tender sum limit/other items cost/compilation