| 注册
首页|期刊导航|国际设备工程与管理(英文版)|The Electrical Control System PLC Transformation of The T68 Boring

The Electrical Control System PLC Transformation of The T68 Boring

XU Liang-xiong

国际设备工程与管理(英文版)2014,Vol.19Issue(2):116-121,6.
国际设备工程与管理(英文版)2014,Vol.19Issue(2):116-121,6.DOI:10.13434/j.cnki.1007-4546.2014.0208

The Electrical Control System PLC Transformation of The T68 Boring

The Electrical Control System PLC Transformation of The T68 Boring

XU Liang-xiong1

作者信息

  • 1. College of Electromechanical Engineering,Wuhan Technical College of Communications ,Wuhan 430065, P.R.China
  • 折叠

摘要

关键词

mitsubishi FX2N-48MR PLC/T68 boring machine electrical control system transformation

Key words

mitsubishi FX2N-48MR PLC/T68 boring machine electrical control system transformation

引用本文复制引用

XU Liang-xiong..The Electrical Control System PLC Transformation of The T68 Boring[J].国际设备工程与管理(英文版),2014,19(2):116-121,6.

基金项目

The paper is supported by Hubei Province Education Science "Twelfth Five Year Plan"2013 Annual Research Topic,No.2013B298 ()

国际设备工程与管理(英文版)

1007-4546

访问量0
|
下载量0
段落导航相关论文