中国电力2014,Vol.47Issue(10):1-6,29,7.
±800 kV同塔双回输电线路十字组合角钢塔承载力真型试验
Full-Scale Test for Cruciform Angle Tower Applied in ±800 kV Double-Circuit Transmission Lines on the Same Tower
摘要
关键词
±800kV/同塔双回输电线路/十字组合角钢塔/真型试验/连接方式/受力不均匀性Key words
±800 kV/double-circuit transmission lines on the same tower/cruciform angle tower/full-scale test/connection mode/stress unevenness分类
信息技术与安全科学引用本文复制引用
韩军科..±800 kV同塔双回输电线路十字组合角钢塔承载力真型试验[J].中国电力,2014,47(10):1-6,29,7.基金项目
This work is jointly supported by National Natural Science Foundation of China (51178014) and Science and Technology of State Grid Corporation of China (GY110025).国家自然科学基金资助项目(51178014) (51178014)
国家电网公司科技资助项目(GY110025) (GY110025)