| 注册
首页|期刊导航|东华大学学报(英文版)|Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data

Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data

HU Tian-song HUANG Hong-zhong WANG Xiao-ming LI Guang GAO Su-he

东华大学学报(英文版)2014,Vol.31Issue(6):779-781,3.
东华大学学报(英文版)2014,Vol.31Issue(6):779-781,3.

Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data

Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data

HU Tian-song 1HUANG Hong-zhong 1WANG Xiao-ming 2LI Guang 2GAO Su-he2

作者信息

  • 1. School of Mechanical Electronic and Industrial Engineering, University of Electronic Science and Technology of China, Chengdu 611731, China
  • 2. Taiyuan Heavy Industry Co., Ltd., Taiyuan 030024, China
  • 折叠

摘要

关键词

reliability allocation/large mining excavators/the entropy method

Key words

reliability allocation/large mining excavators/the entropy method

分类

通用工业技术

引用本文复制引用

HU Tian-song,HUANG Hong-zhong,WANG Xiao-ming,LI Guang,GAO Su-he..Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data[J].东华大学学报(英文版),2014,31(6):779-781,3.

基金项目

National High-Tech Research and Development Program (863 Program),China (No.2012AA062001) (863 Program)

东华大学学报(英文版)

1672-5220

访问量0
|
下载量0
段落导航相关论文