首页|期刊导航|东华大学学报(英文版)|Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data
东华大学学报(英文版)2014,Vol.31Issue(6):779-781,3.
Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data
Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data
摘要
关键词
reliability allocation/large mining excavators/the entropy methodKey words
reliability allocation/large mining excavators/the entropy method分类
通用工业技术引用本文复制引用
HU Tian-song,HUANG Hong-zhong,WANG Xiao-ming,LI Guang,GAO Su-he..Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data[J].东华大学学报(英文版),2014,31(6):779-781,3.基金项目
National High-Tech Research and Development Program (863 Program),China (No.2012AA062001) (863 Program)