| 注册
首页|期刊导航|东华大学学报(英文版)|Electric Multiple Unit Bogie Maintainability Allocation with Interval Analysis and Fuzzy Evaluation Method

Electric Multiple Unit Bogie Maintainability Allocation with Interval Analysis and Fuzzy Evaluation Method

LI Yong-hua YU Hong-jie

东华大学学报(英文版)2014,Vol.31Issue(6):860-862,3.
东华大学学报(英文版)2014,Vol.31Issue(6):860-862,3.

Electric Multiple Unit Bogie Maintainability Allocation with Interval Analysis and Fuzzy Evaluation Method

Electric Multiple Unit Bogie Maintainability Allocation with Interval Analysis and Fuzzy Evaluation Method

LI Yong-hua 1YU Hong-jie1

作者信息

  • 1. School of Traffic and Transportation Engineering, Dalian Jiaotong University, Dalian 116 028, China
  • 折叠

摘要

关键词

Maintainability Allocation/Interval Analysis/Fuzzy Comprehensive Evaluation/Bogie

Key words

Maintainability Allocation/Interval Analysis/Fuzzy Comprehensive Evaluation/Bogie

分类

交通工程

引用本文复制引用

LI Yong-hua,YU Hong-jie..Electric Multiple Unit Bogie Maintainability Allocation with Interval Analysis and Fuzzy Evaluation Method[J].东华大学学报(英文版),2014,31(6):860-862,3.

基金项目

Traction Power State Key Laboratory of Southwest Jiaotong University,China (No.TPL1 312) (No.TPL1 312)

Key Project of Technology Research and Development Plan of Railway Ministry,China (NO.2012J009-A) (NO.2012J009-A)

National Natural Science Foundation of Liaoning Province,China (No.2014028020) (No.2014028020)

Liaoning Province Education Administration Project,China (No.L20138182) (No.L20138182)

东华大学学报(英文版)

1672-5220

访问量4
|
下载量0
段落导航相关论文