| 注册
首页|期刊导航|兵工自动化|基于动态规划下地震现场搜救兵力配置研究

基于动态规划下地震现场搜救兵力配置研究

李浩 汪杰 王公宝

兵工自动化Issue(9):45-47,67,4.
兵工自动化Issue(9):45-47,67,4.DOI:10.7690/bgzdh.2014.09.013

基于动态规划下地震现场搜救兵力配置研究

Study on Force Allocation Problem of Rescue and Search in Earthquake Site Based on Dynamic Programming

李浩 1汪杰 1王公宝2

作者信息

  • 1. 中国人民武装警察部队警官学院,成都 610213
  • 2. 海军工程大学理学院,武汉 430033
  • 折叠

摘要

Abstract

In view of the search and rescue force allocation problems that exist currently in the earthquake site, put forwards the dynamic programming method to solve the problem. Briefly introduce the basic methods and steps of the dynamic programming model, establishes a static mathematical and dynamic programming model about the force allocation problem of rescue and search in earthquake site, and finds optimal strategy about rescue and search in earthquake site by solving the dynamic programming model. The results show that, the model has the advantages of simple structure, small computational difficulty, optimal allocation ability, easy computer operation, can effectively solve the force allocation problem and other nonlinear mathematical problems.

关键词

动态规划/地震/搜索救援/兵力配置/最优化

Key words

dynamic programming/earthquake/search and rescue/force allocation/optimization

分类

军事科技

引用本文复制引用

李浩,汪杰,王公宝..基于动态规划下地震现场搜救兵力配置研究[J].兵工自动化,2014,(9):45-47,67,4.

基金项目

国家自然科学基金资助项目(70471031) (70471031)

兵工自动化

OACSTPCD

1006-1576

访问量5
|
下载量0
段落导航相关论文