城市轨道交通桥梁支座更换施工技术探讨

韩倩 王健

北京建筑大学学报Issue(1):42-46,5.
北京建筑大学学报Issue(1):42-46,5.

城市轨道交通桥梁支座更换施工技术探讨

Brief Analysis of Construction Technology of Bridge Bearing for Urban Rail Transit

韩倩 1王健1

作者信息

  • 1. 北京建筑大学 土木与交通工程学院,北京 100044
  • 折叠

摘要

Abstract

With the large number of new bridges put into use, bridge detection and reinforcement technology has been paid more and more attention. Because of the large transportation volume and the high frequency of use, the bridge structures of urban rail transit lines are more prone to different kinds of diseases. Among them the damage of bridge bearing is particularly common. Synchronous lifting technology is currently the most commonly used technique for replacing bearings. The main principle is to carry out the savely lifting of the bridge superstructure through the synchronous control of jack. For the urban rail transit lines, the whole construction of replacing bearings must be finished without interruption or try to shorten the time of interrupting the traffic. So the construction technology of bridge bearing for urban rail transit needs more precise construction control.

关键词

桥梁/支座更换/城市轨道交通/同步顶升

Key words

bridge/replacing bearings/urban rail transit/synchronous lifting technology

分类

交通工程