| 注册
首页|期刊导航|长江科学院院报|水泥改性土作业面存在的问题及工程处理措施

水泥改性土作业面存在的问题及工程处理措施

强鲁斌 徐萍

长江科学院院报Issue(5):100-104,5.
长江科学院院报Issue(5):100-104,5.DOI:10.3969/j.issn.1001-5485.2015.05.019

水泥改性土作业面存在的问题及工程处理措施

Problems and Engineering Treatment Measures in the Operation of Cement Modified Soil

强鲁斌 1徐萍2

作者信息

  • 1. 长江岩土工程总公司 武汉,武汉 430010
  • 2. 湖北长江工程设计有限公司,武汉 430010
  • 折叠

摘要

Abstract

In the expansive soil region of the middle route of south-to-north water transfer project,cement modified soil with certain content and thickness is required to replace expansive soil in order to protect the canal slope.In the process of soil exchanging and filling,problems are often encountered,including suspension of exchanging-fill-ing operation,weathering and cracking of slope soil,scour damage of filled layer and mal-draining of groundwater. If the above problems are mishandled,the quality of soil exchanging and filling will be affected,and may even cause the slope deformation failure.In this paper,these problems are analysed in depth,and corresponding engi-neering treatment measures are put forward,and crucial points of the construction process are also given.It is of guiding significance for the engineering construction of expansive soil.

关键词

膨胀土/水泥改性土/作业面/风化干裂/南水北调中线工程

Key words

expansive soil/cement modified soil/operation plane/weathering and cracking/middle route of south-to-north water transfer project

分类

建筑与水利

引用本文复制引用

强鲁斌,徐萍..水泥改性土作业面存在的问题及工程处理措施[J].长江科学院院报,2015,(5):100-104,5.

基金项目

国家“十二五”科技支撑计划课题 ()

长江科学院院报

OA北大核心CSCDCSTPCD

1001-5485

访问量0
|
下载量0
段落导航相关论文