水泥改性土作业面存在的问题及工程处理措施
Problems and Engineering Treatment Measures in the Operation of Cement Modified Soil
摘要
Abstract
In the expansive soil region of the middle route of south-to-north water transfer project,cement modified soil with certain content and thickness is required to replace expansive soil in order to protect the canal slope.In the process of soil exchanging and filling,problems are often encountered,including suspension of exchanging-fill-ing operation,weathering and cracking of slope soil,scour damage of filled layer and mal-draining of groundwater. If the above problems are mishandled,the quality of soil exchanging and filling will be affected,and may even cause the slope deformation failure.In this paper,these problems are analysed in depth,and corresponding engi-neering treatment measures are put forward,and crucial points of the construction process are also given.It is of guiding significance for the engineering construction of expansive soil.关键词
膨胀土/水泥改性土/作业面/风化干裂/南水北调中线工程Key words
expansive soil/cement modified soil/operation plane/weathering and cracking/middle route of south-to-north water transfer project分类
建筑与水利引用本文复制引用
强鲁斌,徐萍..水泥改性土作业面存在的问题及工程处理措施[J].长江科学院院报,2015,(5):100-104,5.基金项目
国家“十二五”科技支撑计划课题 ()