摘要
Abstract
During the MapGIS software processing the geological map without base data, there is great dififculty in the late utilization stage, for example the accuracy is not enough, and drawing speed is slow. This paper summarizes an effective method of transferring contour map into numerical value which is so convenient for post-data analysis. To take an “average subsidence rate map within 5 years” as an example, that is required in geological hazard assessment work, this paper shows the detailed converting processes from the contour map to numerical value.关键词
Mapgis/地质图件/等值线/数据整理/地质灾害危险性评估Key words
MapGIS software/Geological maps/Contour, Data processing/Geological hazard assessment分类
信息技术与安全科学