城市建筑Issue(8):107-107,1.
地铁车站特殊施工技术方法和保证控制措施
The Special Construction Technology Methods and Control Measures of Subway Station
沈付生1
作者信息
- 1. 中国重庆国际经济技术合作公司400020
- 折叠
摘要
Abstract
The QiXing Gang subway station of Chongqing No.1 adopts a set of special construction technology methods and control measures. The project construction is precisely or-ganized, and the workers finished station excavation tunnel lining construction efficiently and safety. The success experi-ence of the project construction technology can provide a ce-rtain construction technology reference to similar projects.关键词
地铁车站/施工技术方法/控制措施Key words
the subway station/construction technology and method/control measures引用本文复制引用
沈付生..地铁车站特殊施工技术方法和保证控制措施[J].城市建筑,2014,(8):107-107,1.