城市建筑Issue(8):236-236,238,2.
工程量清单计价模式存在的问题分析及改善措施
Analysis of Existing Problems and Improvement Measures of BOQ Valuation Mode
楼佩琼1
作者信息
- 1. 上海第一测量师事务所有限公司200081
- 折叠
摘要
Abstract
This paper from the list compiled, list pricing and other aspects in tender documents, analyzes problems existing and management measures in the application of Valuation Co-des with Bill Quantity, provides reference for engineering cost consultation.关键词
工程量清单/编制/计价/改善措施Key words
engineering quantity list/compiled/valuation/im-provement measures引用本文复制引用
楼佩琼..工程量清单计价模式存在的问题分析及改善措施[J].城市建筑,2014,(8):236-236,238,2.