Abstract

In the no.1 blast furnace construction of Hangzhou Iron and steel, the river crossing pipe galery made by fash-ioned iron with the 5×4.42m cross section size and 82.5t total weights. This article mainly introduces the importance of rea-sonable seting multiple machines lift crane, and use the "Po-ntoon" asa long-span component integral lifting method of te-mporary removable supporting point.

关键词

管廊/起重吊装/多机抬吊/浮船

Key words

the pipe galery/lifting/multiple machines lift c-rane/pontoon