城市建筑Issue(12):365-365,389,2.
石津干渠右岸路面排水设计浅析
Analysis of the Pavement Drainage Design of the Right Bank in Shijin Main Canal
姚丽华1
作者信息
- 1. 河北省水利水电勘测设计研究院,天津 300250
- 折叠
摘要
Abstract
In order to prevent the rain water of 307 national highway road on the right bank of Shijin main canal inflows the canal to polute the water delivery quality, the author plan to set the concrete retaining wal at the main canal right slope, and the retaining wal instal the drainage ditch, and through a certain spacing of transverse aqueduct to put the road surface water into the south ditch on the side of road.关键词
南水北调/路面排水/排水设计Key words
thesouth-to-north water diversion project/surface drainage/drainage design引用本文复制引用
姚丽华..石津干渠右岸路面排水设计浅析[J].城市建筑,2014,(12):365-365,389,2.