城市中心高架钢桥施工期保畅通实践

王娟 周林

城市建筑Issue(14):342-343,2.
城市建筑Issue(14):342-343,2.

城市中心高架钢桥施工期保畅通实践

The Elevated Steel Bridge Construction Period to Protect Open Practice in the Heart of the City

王娟 1周林1

作者信息

  • 1. 中国水利水电第三工程局有限公司,西安 710016
  • 折叠

摘要

Abstract

Transform the old road and construct the viaduct wil intensify during the construction of road congestion. In the rapidness reform of the north third ring road in Zhengzhou, the author takes the comprehensive measures of organization, ma-nagement, technology, and economy, etc and achieves the goal of the original main road unimpeded during the construction period, which can provide experience and reference for similar projects.

关键词

城市中心/道路改造/施工期/畅通

Key words

the city center/road reconstruction/construction period/unimpeded