城市建筑Issue(18):156-156,1.
双曲线冷却塔施工质量的探讨
Discuss the Construction Quality of the Hyperbolic Cooling Tower
郭付平1
作者信息
- 1. 青海金世纪工程项目管理有限公司,格尔木 816000
- 折叠
摘要
Abstract
This article analyzes and combines with the cor-responding prevention measures in view of the common qua-lity problems of hyperbolic cooling tower in the construction process.关键词
冷却塔/主要措施Key words
cooling tower/main measures引用本文复制引用
郭付平..双曲线冷却塔施工质量的探讨[J].城市建筑,2014,(18):156-156,1.