摘要
Abstract
This article briefly introduces the construction tec-hnology and mechanical model of composite soil nailing wal . The author combines with engineering cases, compares differ-rent retaining scheme, and use the software to calculate, and then briefly summarizes the construction control essentials. Fi-nal y the author combines with the monitoring data, evaluate the complete effect, and draw useful conclusions.关键词
超前锚杆/复合土钉墙/深基坑Key words
advanced anchor/composite soil nailing wal/de-ep foundation pit