浅述深圳地铁5号线黄贝站给排水管线改迁设计
Discuss the Water Supply and Drainage Pipeline Change Design of Shenzhen Metro Line 5 Huang Bei Station
陈彦冰1
作者信息
- 1. 中国瑞林工程技术有限公司,南昌330031
- 折叠
摘要
Abstract
This article bases on the construction methods of Huangbei station and the requirements of WeiDang, and puts forward the corresponding pipeline to move in stages, incl-uding pipeline migration route, the direction of the pipeline reinforcement, pipeline suspension and other solutions. Under the premise of not affecting the surrounding users, the req-uirements of the subway station and construction have been satisfied.关键词
地铁施工/管线改迁/站体Key words
subway construction/pipeline to move/standing body引用本文复制引用
陈彦冰..浅述深圳地铁5号线黄贝站给排水管线改迁设计[J].城市建筑,2014,(18):204-204,229,2.