新造珠江大桥主梁0#块施工技术OA
0 # Block Construction Technology of Newly Pearl River Bridge Girder
本文介绍了广州新造珠江大桥的主梁0#块施工情况,针对0#块分支架、挂篮施工相结合的施工方法做出了主要阐述,突出了其与传统施工方法的差异,强调了临时索、挂篮提前应用的先进性和优势,希望对以后类似的斜拉桥主梁0#块施工提供借鉴。
This article introduces the 0# block girder con-struction situation of Guangzhou newly Pearl River Bridge, and expounds the construction technology that a combination of 0# block and hang blue construction, highlights the di-fferences from traditional construction methods and the adv-ancement and advantage of temporary stay arrangement and hang blue construction, and hope to provide certain reference for future similar projects.
杨江宏
中交路桥华南工程有限公司,中山528403
0#块临时索挂蓝施工
0# blocktemporary stay arrangementhang blue construction
《城市建筑》 2014 (20)
330-330,1