| 注册
首页|期刊导航|城市建筑|浅析长兴岛系杆拱桥拱肋拼装排架支撑系统

浅析长兴岛系杆拱桥拱肋拼装排架支撑系统

陈建波

城市建筑Issue(21):340-341,2.
城市建筑Issue(21):340-341,2.

浅析长兴岛系杆拱桥拱肋拼装排架支撑系统

Introduction to Support System of Arch Rib Assembly Bent of Tied-arc Bridge at Changxing Island

陈建波1

作者信息

  • 1. 上海宝山水利工程有限公司 200940
  • 折叠

摘要

Abstract

This article expounds reconstruction project of sluice outward at Changxing Island Xinkai Port. According to the most unfavorable load, the article checks the security and stability of the bent, and then designs the support system of bent. In order to form ensemble, it can be hoist symmetrical y one by one, then welding. In order to form the whole arched girder, the pumping concrete can be fil ed to symmetrical jacking in the arch rib, and then the bent support system can be removed final y.

关键词

系杆拱桥/钢管拱肋分段/排架布置

Key words

tied-arc bridge/steel tube arch rib section/bent arrangement

引用本文复制引用

陈建波..浅析长兴岛系杆拱桥拱肋拼装排架支撑系统[J].城市建筑,2014,(21):340-341,2.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文