摘要
Abstract
The protection engineering of White crane under- water is constructed by using the principle of “non pressure container”. The traffic corridor is laid in the embankment slope, connecting the ground museum and underwater tour corridor, which is composed of a corridor of slope type and traffic co- rridor. When the cofferdam is completed, traffic corridors, by using formwork cast-in-place method, are divided into secti- onal formwork, and are poured with tie reinforcement.关键词
白鹤梁题刻/交通廊道/垫层/施工Key words
white crane underwater/transportation corridor/cushion/construction