浅谈后张法现浇箱梁预应力张拉施工问题处理

陈余 卫千峰 房飞

城市建筑Issue(30):227-227,1.
城市建筑Issue(30):227-227,1.

浅谈后张法现浇箱梁预应力张拉施工问题处理

Discussion on Construction Problems of Prestressed Tensioning Cast-in-situ Box Girder Tension

陈余 1卫千峰 1房飞1

作者信息

  • 1. 中建八局第三建设有限公司 210046
  • 折叠

摘要

Abstract

In highway bridge construction, especial y in the cross line building, prestressed concrete commonly use post te-nsioning prestress. the author combined the practice of cast-in-place box beam construction of Silver Elephant overpass (f-irst phase), discussing the tension problems in process of con-struction, and taking a special processing method, which prov-ide reference for readers.

关键词

现浇箱梁/后张法施工/非常见问题/特殊处理

Key words

cast-in-place box beam/post tensioning constru-ction/rare problems/special processing