| 注册
首页|期刊导航|城市建筑|南京市城东污水处理厂三期工程工艺设计实例

南京市城东污水处理厂三期工程工艺设计实例

陈启迪

城市建筑Issue(30):256-256,1.
城市建筑Issue(30):256-256,1.

南京市城东污水处理厂三期工程工艺设计实例

Process Design Example of the Third Phase of the Project of the Sewage Treatment Plant in the East of Nanjing City

陈启迪1

作者信息

  • 1. 中国市政工程中南设计研究总院有限公司南京分院
  • 折叠

摘要

Abstract

This paper analyzed that the water quality of the third phase of the project of sewage treatment plant is guar-anteed by using the MBR process which is characterized by good water quality, short process, smal occupation area and less amount of sludge. The engineering design is of great sig-nificance for the design of the similar wastewater treatment pl-ant.

关键词

污水处理厂/MBR

Key words

sewage treatment plant/MBR

引用本文复制引用

陈启迪..南京市城东污水处理厂三期工程工艺设计实例[J].城市建筑,2014,(30):256-256,1.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文