城市建筑Issue(32):234-234,1.
广清城际铁路跨京广铁路连续梁转体施工方案比选
Guangqing Intercity Railway Crossing Jingguang Railway Continuous Beam Rotating Construction Scheme Selection
刘立1
作者信息
- 1. 广东珠三角城际轨道交通有限公司510308
- 折叠
摘要
Abstract
This paper introduces Guangqing intercity railway crossing Jingguang railway construction scheme selection and a series of measures adopted in the construction of rotation, and analyzed and compared advantages and disadvantages of the rotation scheme and the swivel cantilever perfusion scheme in construction safety, construction period, construction techn-ology and other aspects.关键词
城际铁路/连续梁/转体/悬臂灌注Key words
intercity railway/continuous beam/swivel/canti-lever pouring引用本文复制引用
刘立..广清城际铁路跨京广铁路连续梁转体施工方案比选[J].城市建筑,2014,(32):234-234,1.