| 注册
首页|期刊导航|城市建筑|东武仕水电站增效扩容改造必要性及效益分析

东武仕水电站增效扩容改造必要性及效益分析

孔虎泰 张红丽

城市建筑Issue(33):286-286,313,2.
城市建筑Issue(33):286-286,313,2.

东武仕水电站增效扩容改造必要性及效益分析

Analysis of the Necessity and Benefits of Synergistic Expansion and Modification of Dongwushi Hydropower Station

孔虎泰 1张红丽2

作者信息

  • 1. 东武仕水电站
  • 2. 东武仕水库管理处,邯郸 056500
  • 折叠

摘要

Abstract

It has been more than 40 years since the Dongw-ushi Hydropower Station was built and put into operation, so the mechanical and electrical equipment is aging, and its op-erating efficiency is decreasing. Aiming at solving these prob-lems, this article, from the two aspects of the necessity and be-nefit, analyzes the feasibility of the construction of synergistic expansion and transformation of the station which proved to have good social benefits.

关键词

水电站/增效扩容/必要性/效益

Key words

hydropower station/synergistic expansion/neces-sity/benefit

引用本文复制引用

孔虎泰,张红丽..东武仕水电站增效扩容改造必要性及效益分析[J].城市建筑,2014,(33):286-286,313,2.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文