摘要
Abstract
Combining with the engineering example, the aut- hor puts forward some constructive opinions and suggestions for risk control of the geological open-cut construction, con- struction of karst cave strata, the construction of ground with soft higher part and hard lower part, undercuting methods of contact channel construction, shield construction, construction of subway station.关键词
地铁工程/施工风险/控制要点Key words
subway engineering/construction risk/control p- oints