印尼某海滨电厂基坑降水方案研究

刘礼领 刘亚钦 余铁稳

电力勘测设计Issue(z1):229-234,6.
电力勘测设计Issue(z1):229-234,6.

印尼某海滨电厂基坑降水方案研究

Study on Foundation Pit Dewater Scheme of the Power Plant nearby Sea in Indusia

刘礼领 1刘亚钦 1余铁稳1

作者信息

  • 1. 中南电力设计院,湖北 武汉 430071
  • 折叠

摘要

Abstract

In this paper, the power plant foundation pit was taken as an example, foundation pit dewater scheme of the power plant was discussed, the hydrogeological conditions of power plant nearby the sea was introduced in detail, foundation pit dewatering schemefor complex hydrogeological conditions was designed, the effect of different foundation dewater scheme was studied, ultimately the dewatering scheme of tube well dewatering and open-ditch drainage are combined as the optimum scheme and so as to shorten the construction period, reduce cost, and successful experience for the design of such foundation pit dewater wasprovided.

关键词

基坑降水/地下水/数值模拟/Modlfow

Key words

foundation pit dewater/groundwater/numerical simulation/modlfow

分类

建筑与水利

引用本文复制引用

刘礼领,刘亚钦,余铁稳..印尼某海滨电厂基坑降水方案研究[J].电力勘测设计,2015,(z1):229-234,6.

电力勘测设计

1671-9913

访问量0
|
下载量0
段落导航相关论文