地质论评Issue(1):149-154,6.
深厚软土地区基坑开挖主要工程地质问题与对策
The Research of Main Engineering Geological Problems and Prevention Measures in the Pit Construction of Soft Soil Areas
摘要
Abstract
In order to solve the problem of city residents live and heavy traffic,the underground engineering construction have entered a rapid development period in the city of southeast coastal regions.The excavation depth of high rise building pit is more and more,the pit is a kind of common construction method in the node projects construction of the subway,and the pit presents a multilayer development trend.However,muddy soft soil of the Holocene is widely distributed in coastal area.Because the properties of soft soil is poor,the construction of pit is very difficult,it is easy to occur some engineering geological problems,such as instability of pit slope,bursting mud and water and the failure of supporting structure,etc.Which bring out some adverse environmental effects, such as ground subsidence,uneven settlement,buildings cracking and damage around the pit.Some engineering geological problems and adverse environmental effects in deep pit construction had intensively been studied in soft soil area,the main factors of affecting foundation pit safety had been analyzed,and the specific prevention measures had put forward in this paper.The prevention measures is successful by the verification of construction of practical foundation pit in soft soil area.关键词
深基坑/软土/工程地质问题/防治措施Key words
deep pit/soft soil/engineering geological problems/prevention measures引用本文复制引用
闫怀瑞,阎长虹,丁倩文..深厚软土地区基坑开挖主要工程地质问题与对策[J].地质论评,2015,(1):149-154,6.基金项目
本文为教育部博士点基金资助项目(编号2013000820)和江苏省科技厅项目(编号BE2011772)的成果。 ()