| 注册
首页|期刊导航|工程地质学报|蓄水与施工作用下滑坡变形机制与稳定性分析

蓄水与施工作用下滑坡变形机制与稳定性分析

卢永兴 肖建章 许冲 谢启智 袁华

工程地质学报Issue(3):386-395,10.
工程地质学报Issue(3):386-395,10.DOI:10.13544/j.cnki.jeg.2014.03.006

蓄水与施工作用下滑坡变形机制与稳定性分析

DEFORMATION MECHANISM AND STABILITY ANALYSIS OF LANDSLIDE UNDER IMPOUNDMENT AND CONSTRUCTION

卢永兴 1肖建章 2许冲 3谢启智 4袁华5

作者信息

  • 1. 中国科学院地质与地球物理研究所 北京 100029
  • 2. 中国科学院大学 北京 100049
  • 3. 中国水利水电科学研究院流域水循环模拟与调控国家重点实验室 北京 100038
  • 4. 中国地震局地质研究所活动构造与火山重点实验室 北京 100029
  • 5. 中南勘测设计研究院 长沙 410014
  • 折叠

摘要

Abstract

The Guanyinping landslide turned up evident deformation.There were two possible cause factors.One is the first-stage impoundment of Xiangjiaba hydropower station and the other is the rebuilding construction of the the 307 provincial road whose cutting and filling project had just been finished.The real cause triggering the landslide deformation remains to be controversial between the reservoir impoundment and the construction of the rebuilt road. Based on the landslide deformation behaviors and the results of in-situ monitoring,the deformation mechanism of the landslide is discussed specifically in this paper.In order to analyze the stability of the landslide,a 2D model is developed by using the finite element numerical simulation.The factors of safety under various operational conditions are calculated through shear strength reduction method.The result shows the following three points:(1) Construction of the rebuilt road and the rising of reservoir water level are both against the whole stability of the landslide,especially the rising of reservoir water level;(2)After the construction of the rebuilt road and the first-stage impoundment,the landslide is in the critical stable state.Supposing no reinforcement measure is taken,the factor of safety reduces continually under the second-stage impoundment and the normal impoundment;(3 )The treatment measure of cutting slope and unloading is presented.The factor of safety can meet the requirements of norms under the second-stage impoundment and the normal impoundment after being controlled.The relevant conclusions and methods proposed can provide the references for the treatment for the similar landslides.

关键词

库岸滑坡/复建公路施工/水库蓄水/变形机制/稳定性

Key words

Reservoir bank landslide/Construction of the rebuilt road/Reservoir impoundment/Deformation mechanism/Stability

分类

天文与地球科学

引用本文复制引用

卢永兴,肖建章,许冲,谢启智,袁华..蓄水与施工作用下滑坡变形机制与稳定性分析[J].工程地质学报,2014,(3):386-395,10.

基金项目

国家973项目(2014CB04700)和国家自然科学基金资助项目(41202235)资助. ()

工程地质学报

OA北大核心CSCDCSTPCD

1004-9665

访问量0
|
下载量0
段落导航相关论文