| 注册
首页|期刊导航|广东电力|600 MW超临界机组无外来辅助蒸汽热态启动方案探讨

600 MW超临界机组无外来辅助蒸汽热态启动方案探讨

苏升文

广东电力Issue(4):36-40,5.
广东电力Issue(4):36-40,5.DOI:10.3969/j.issn.1007-290X.2014.04.008

600 MW超临界机组无外来辅助蒸汽热态启动方案探讨

Discussion on Hot Start Scheme of 600 MW Supercritical Units without Auxiliary Steam

苏升文1

作者信息

  • 1. 佛山恒益发电有限公司,广东 佛山528131
  • 折叠

摘要

Abstract

The supercritical unit relies on startup power or auxiliary steam in case of restart after tripping.This paper explores a fast startup scheme,in which auxiliary steam and startup boiler operation are all not necessary.The paper also analyzes problems in hot start of the units without auxiliary steam and proposes relevant control measures in accordance with imple-mentation scheme so as to enable fast hot startup.By this startup mode,the time of hot startup can be reduced by 3.5 h,and production cost by 154 thousand Yuan.

关键词

超临界机组/辅助蒸汽/热态启动

Key words

supercritical units/auxiliary steam/hot start

分类

能源科技

引用本文复制引用

苏升文..600 MW超临界机组无外来辅助蒸汽热态启动方案探讨[J].广东电力,2014,(4):36-40,5.

广东电力

OACSTPCD

1007-290X

访问量0
|
下载量0
段落导航相关论文