Abstract
In order to solve problems of large vibration and long-term over-standard of vibration of No.6 and No.7 bear-ings of 330 MW unit in some power plant in operation,finite element modeling was applied for force analysis on beams of basic Ⅳ frame of the steam turbine and its related bearing pedestal.The results indicated that the main reason for abnormal vibration of the bearing was insufficient axial stiffness of the basic Ⅳ frame of the steam turbine.Therefore,a scheme of reinforcing basic Ⅳ frames of bearing pedestals of No.6 and No.7 bearings was proposed.It was proved that this scheme could produce good effects and ensure safe and stable operation of the unit.关键词
汽轮机/轴承座/振动/刚度/加固Key words
steam turbine/bearing pedestal/vibration/stiffness/reinforcement分类
信息技术与安全科学引用本文复制引用
邱全文..某厂330 MW 机组6号、7号轴承振动大的缺陷处理[J].广东电力,2015,(5):36-39,4.