In order to solve problems of large vibration and long-term over-standard of vibration of No.6 and No.7 bear-ings of 330 MW unit in some power plant in operation,finite element modeling was applied for force analysis on beams of basic Ⅳ frame of the steam turbine and its related bearing pedestal.The results indicated that the main reason for abnormal vibration of the bearing was insufficient axial stiffness of the basic Ⅳ frame of the steam turbine.Therefore,a scheme of reinforcing basic Ⅳ frames of bearing pedestals of No.6 and No.7 bearings was proposed.It was proved that this scheme could produce good effects and ensure safe and stable operation of the unit.

关键词

汽轮机/轴承座/振动/刚度/加固

Key words

steam turbine/bearing pedestal/vibration/stiffness/reinforcement