广东电力Issue(5):67-71,5.DOI:10.3969/j.issn.1007-290X.2015.05.014
水电站保证出力复核计算方法的改进
Improvement of Check Calculation Method for Guaranteed Output of Hydropower Station
汪菲娜 1谈飞1
作者信息
- 1. 河海大学 商学院,江苏 南京 211100
- 折叠
摘要
Abstract
Guaranteed output of hydropower station is an important running parameter for hydroelectric power.After run-ning many years,it requires to carry out check for guaranteed output of the hydropower station in order to preferably guide operation of the hydropower station.Methods for check calculation on guaranteed output includes equal mass flow method which is suitable for daily-storage hydropower station and co-output method which is suitable for annual storage carryover storage hydropower stations.Due to shortages of co-output method,idea of dichotomy was applied in calculating guaranteed output by co-output method and improving co-output method.The improved calculation method was applied in example cal-culating analysis and the result indicated that the calculation method combining dichotomy and co-output method could effec-tively work out guaranteed output of the hydropower station.关键词
水电站/保证出力/复核/等出力法/等流量法/二分法Key words
hydropower station/guaranteed output/check/co-output method/equal mass flow method/dichotomy分类
建筑与水利引用本文复制引用
汪菲娜,谈飞..水电站保证出力复核计算方法的改进[J].广东电力,2015,(5):67-71,5.