径流式电站厂房混凝土叠梁门临时封堵设计

朱春生 何毅

广东水利水电Issue(11):46-50,5.
广东水利水电Issue(11):46-50,5.

径流式电站厂房混凝土叠梁门临时封堵设计

Temporary Plugging Design of Concrete Stop Log Gate of Radial Flow Power Plant

朱春生 1何毅2

作者信息

  • 1. 广东珠荣工程设计公司,广东广州 510610
  • 2. 葛洲坝集团第一工程有限公司,湖北宜昌 443000
  • 折叠

摘要

Abstract

With low investment, single section and light weight, concrete stop log gate, of which the hoisting equipment ability request is not high, is often used as temporary plugging gate at the inlet and outlet of the radial flow power plant.Despite the concrete stop log gate is a temporary construction engineering in the process of hydropower station construction, it directly affects the safe operation of hydropower station unit installation and power generation on schedule, therefore it is very important in the engineering construction.This article will take Shihutang navigation-power junction project on Gan river in Jiangxi as an example and introduce the main temporary plugging design technology points of concrete stop log gate of water intake gate of the power plant and provide reference for similar projects.

关键词

石虎塘航电枢纽/混凝土叠梁门/临时封堵

Key words

Shihutang navigation-power junction project/Concrete stop log gate/Temporary plugging