| 注册
首页|期刊导航|广东水利水电|观音岩水电站生态流量研究

观音岩水电站生态流量研究

李进勇

广东水利水电Issue(3):14-16,3.
广东水利水电Issue(3):14-16,3.

观音岩水电站生态流量研究

Study on Ecologic Flow of Guanyinyan Hydropower Station

李进勇1

作者信息

  • 1. 大唐观音岩水电开发有限公司,四川攀枝花 617000
  • 折叠

摘要

Abstract

In order to maintain the stability of river basin ecosystem , to ensure the security of river ecological water requirement , it is very important to select the appropriate ecological water requirement .Taking Guanyinyan Hydropower Station for an example , according to the relationship between river cross section curves and elevation and flow , hydraulic parameter has been calculated , and then the wetted perimeter method , Tennant method and R2-CROSS method have been used to calculate the minimum ecological flow of Guanyinyan hydropower .Through research , it is shown that for large river the minimum ecological flow which calculated by Tennant method and R2-CROSS method are close and relatively reasonable .

关键词

水电站/环保/最小生态流量

Key words

hydropower station/environmental protection/minimum ecological flow

分类

资源环境

引用本文复制引用

李进勇..观音岩水电站生态流量研究[J].广东水利水电,2015,(3):14-16,3.

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文