摘要
Abstract
In order to carry out the comprehensive renovation of the main dangerous section of Shunde waterway in Lecong, based on the cause analysis of danger, a comprehensive renovation program has been put forward which is suitable for the characteristics of the danger, and combining with physical model test to validate research.And it is shown that the effect is good.The regime of the dangerous section has different degrees of improvement after the implementation of the program, in addition, the mainstream line moves to the middle or right, and the riverbed erosion is weakening.关键词
乐从险段/河道整治/南顺联围/河工模型/丁坝护岸/清障措施Key words
the dangerous section of Lecong/river renovation/dike/physical model/spur dike revetment/measures to remove barriers分类
建筑与水利