Abstract

The maximum slope of powerhouse in Madushan hydropower project is about 120m high.It has a wide distribution of complex geological conditions, and the slope has an outside tendency.The slope design scheme is improved with field geological investigation, inversion analysis of slope parameters and the local engineering experience.The project has been completed for years. The in-situ monitoring data shows that the design scheme is safe and reliable.The slope design ideas and scheme have certain reference significance to similar project design work.

关键词

水电站/边坡设计/支护设计

Key words

hydropower station/slope design/supporting design

分类

建筑与水利

引用本文复制引用

毕树根,袁喆,修翅飞..马堵山水电站工程发电厂房后边坡设计[J].广东水利水电,2015,(4):37-40,4.

广东水利水电

1008-0112

访问量3
|
下载量0
段落导航相关论文